Hello,
I have created around 10 seperate packages for our application data load. Now I am planning to create a master package (or a wrapper package) which will execute all the 10 packages (thru execute package task). Then I have a job which executes the master package at a given date and time.
Question : How can I enable / disable execution of each package within the master package depending upon a flag variable. The reason why I need this mechanism is if the flag = 0 then I don't want all 10 packages within master package to execute and if flag = 1 then master package execution should begin and subsequently execute all packages within that master package.
Thank you
Jatin Shah