Hello, I have three steps, that are the same as one another just a different table of focus, a Delete table that connects to a data flow task that runs SQL on Teradata and lands data on local SQL Server. Right now I have that in a Sequence Container. I
know that if I didn't have it in the Seq Cont that it would still run in a sequential manner. How can I run this all in parallel, if possible? Thanks
↧