Quantcast
Channel: SQL Server Integration Services forum
Viewing all articles
Browse latest Browse all 24688

ETL-Job Failed on Production System

$
0
0

Code: 0xC0202009     Source: XXXXXXXX   Description: SSIS Error Code DTS_E_OLEDBERROR.  
An OLE DB error has occurred. Error code: 0x80004005.  
An OLE DB record is available.  Source: "Microsoft SQL Server Native Client 10.0"  Hresult: 0x80004005  Description: "Communication link failure". 
 An OLE DB record is available.  Source: "Microsoft SQL Server Native Client 10.0"  Hresult: 0x80004005  Description: "Shared Memory Provider: Timeout error [258]. ". 
 End Error  Code: 0xC004701A     Source: DFTXXXXXX SSIS.Pipeline     Description: component "OLE DB DFTXXXXXX "  failed the pre-execute phase and returned error code 0xC0202009.  
End Error  DTExec: The package execution returned DTSER_FAILURE (1). 

Below are the options we have tried in our environment:

1. Change remote query time out options

2. Change remote login time out options

3. Setting a Maximum Memory Limit for a SQL Server Instance

4. Delay Validation Property



Viewing all articles
Browse latest Browse all 24688

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>